FCDL Comment:
The dollars requested were reduced to remove the ineligible products/services: 25pr Cable 10ft Cat 3 Female AMP Receptacle, Block 50PR (opxs), Block Brkt 89b 66, Digital OPX Secondary Protection, Edco Trunk Line Protection, BCM Connector Kit along with the portion of the following items pertaining to BCM Surge Protection and BCM Connector Kit: Overtime/After Hours Cutover, System Designer Support - 1 hour each, Technician Labor-1 hour as needed, Per Mailbox Labor Charge, Post Cut Support (over 40 stations) and Programming When Using Existing Phone.